About Shan Testing

Specialized HVAC Testing, Adjusting & Balancing (TAB), Duct Leakage Testing, and Electromechanical Commissioning Verification.

Shan Engineers on site
Industrial project site
70+Documented project assignments completed
Our Background

Specialized HVAC Testing, Adjusting and Balancing (TAB)

Shan Testing and Trading Company is a specialized technical service entity delivering professional Testing, Adjusting, and Balancing (TAB), HVAC commissioning support, duct sanitization, and plant maintenance.

We work with main contractors, MEP subcontractors, and facility managers to verify that installed air distribution and chilled water systems operate strictly to approved engineering drawings and specifications. Every job is supported by calibrated digital test instrumentation, structured field data sheets, and transparent deviation tracking.

All testing procedures adhere to SMACNA and ASHRAE 111 guidelines. Field teams coordinate directly with supervising consultants for joint witness testing, formal punch-listing, and certified handover submittals.

tune
Air & Hydronic BalancingAHUs, FCUs, VAVs, fresh air intakes & chilled water loops
verified
Commercial RegistrationRegistered electromechanical entity · CR 2051260195
analytics
Traceable InstrumentsLaboratory-calibrated flow hoods, manometers & anemometers
70+Documented project assignments
25+Client organizations served
15+Regional project locations
6Core engineering disciplines
Strategic Intent

Defined Purpose. Measurable Execution.

Company Visionvisibility

Our Vision

Verified airflow measurements, calibrated instrumentation, and complete handover documentation — on every job.

ACCURACY · OBJECTIVITY · EXECUTIONverified
Company Missionexplore

Our Mission

To deliver verified airflow and hydronic balance, thorough commissioning verification, and disciplined HVAC maintenance that ensure building systems perform to approved design criteria and environmental standards.

STANDARDS · COMPLIANCE · SAFETYshield
Core Values

Operating Principles

01

Safety Protocol

Adherence to safety permits, risk assessments, and secure site operating practices.

02

Measurement Care

Use of calibrated instruments to record accurate, repeatable physical readings.

03

Objective Reporting

Transparent reporting of site findings and measured data exactly as observed.

04

Project Coordination

Prompt communication and close coordination with MEP contractors and site teams.

05

Technical Proficiency

Ongoing training in variable air volume (VAV), DDC controls, and hydronic systems.

verified_user
Engineering Commitment

We define project scopes clearly, record site findings objectively, coordinate with all project stakeholders, and provide complete documentation aligned with contract specifications.

View Quality & HSE Policyarrow_forward
Work With Us

Need System Verification or a Project Quote?

Share your project drawings, equipment schedules, or testing requirements and our team will get back to you with a clear proposal.